9 steps to a solar system

Most people are put off by the paperwork with EPS. Here is exactly what happens and in what order. Our part is quick and we give you days for it. For the part that sits with EPS we give no deadline, because nobody can give one honestly: it can be done in a month, and it can drag on for half a year.

  • We handle the paperwork
  • We pay the fees
  • Installation does not cut your power
3-4
days to a signed contract
meeting, quote and signature, if you decide quickly
1
day of installation
a house up to 20 kW on a tiled roof
€0
paperwork and fees
all of it is in the turnkey price
Step 1 / 911% complete
Step 01
Who acts
MySolar

Decision and free site visit

3-4 daysConsultation + roof assessment + offer

We come to your address, survey the roof and orientation, estimate consumption, propose the optimal capacity, and provide a final turnkey offer, no obligation.

What MySolar does
  • On-site visit and measurement
  • Consumption and orientation estimate
  • Final written offer
What you do
  • You sign the contract and advance payment (optional)
Step deliverable
Contract and technical assessment
YouMySolarEPSMunicipality

All steps handled by the MySolar team

You just sign a few documents. The entire process with EPS and the municipality, from request to bidirectional meter, is handled on your behalf.

Start the process

Frequently asked questions

Can I go through the process on my own?
Yes, but the administration is extensive and requires technical knowledge. With us you bring an electricity bill and a copy of your ID and you sign, while our engineer prepares and submits everything else.
How long does the whole process really take?
Our part takes three to four days to a signed contract and one day of installation. The rest is waiting on EPS, and there is no rule to it: it can be done in a month, and it can drag on for half a year. We do not promise a date that is not ours to keep, but we follow every step for you.
What happens with surplus electricity?
Prosumer status lets you send surplus electricity to the grid and use it later (in the evening, in winter). This is the so-called "net metering" model. You don't receive money, but you offset consumption.
Is a building permit required?
For residential systems up to 10.8 kW, usually not. For larger systems and industrial installations yes, and we handle the procedure with the municipality.
What happens if EPS rejects the request?
Rarely happens with a properly prepared project. If it does, the MySolar team files an appeal or adjusts the project at no extra cost.
Are there hidden costs after the contract?
No. MySolar's turnkey price includes everything: from design, supply, and installation to paperwork with EPS and technical acceptance. What you see in the offer is what you pay.